We need helpers to sort our supplies, keep the shed in good order and prepare materials for the trail. If you can't make it for the whole day, any contribution is welcome.
There are a range of jobs to be done which may vary from week to week as we get ready for different projects. Colin can also assign jobs based on your physical abilities.
Tasks to be done over the next few weeks include:
• Preparing camping benches for installation.
• Preparing for the Baderloo toilet installtion trip,
• Installing internal fittings on our newly acquired hut,