Re-route of the Heysen Trail affecting Map 4.5, July 2009

From July 2009 to early 2010 there will be major roadworks associated with the upgrading of the Sturt Highway near Greenock. A new bridge will be constructed along Roennfeldt Road over Greenock Creek. An additional carriageway will be built alongside the existing Sturt Highway which means Roennfeldt Road will be moved south of its current position. Another bridge for the highway will be constructed over Seppeltsfield Road.

Walkers are advised to use caution when walking along the road when machinery is operating. Take care when passing through the area and be sure plant and machinery operators or other workers are aware of your presence. Once the roadworks are complete the Heysen Trail will be rerouted along the Greenock Creek under the new Sturt Highway bridge, then along the northern side of the highway into Greenock.